Recent content by matt43

  1. M

    Help Pa unlock po bartleby

    Answered: A body at a temperature of 50°F is… | bartleby pa unlock po bartleby
  2. M

    Help Pa sagot po pls

    Find the volume of a solid generated by revolving about the y-axis the region bounded by the parabola, y = -x^2+6x-8, and the x-axis. Α. 8π C. 10π B. 9π D. 11π
  3. M

    Help Pa sagot po pls

    Salamat po lods
  4. M

    Help Pa sagot po pls

    Find the volume of a solid generated by revolving about the y-axis the region bounded by the parabola, y = -x^2+6x-8, and the x-axis. Α. 8π C. 10π B. 9π D. 11π
  5. M

    Help Pa sagot po pls

    The average of csc² x over the interval from x = π/б tо x = π/4 is _. A. 2.542 C. 2.796 B. 1.942 D. 3.253
  6. M

    Help Pa sagot po pls

    The average of csc^2 x over the interval from x = π/б tо x = π/4 is _. A. 2.542 C. 2.796 B. 1.942 D. 3.253
  7. M

    Help Pa sagot po pls mga lods

    Find the length of the curve y = ln x between the points where y = 1/2 and y =1. A. 0.53 C. 1.18 B. 0.86 D. 1.36
  8. M

    Help Pa sagot po mga lods

    Mga lods pa help po pa solve Find the acute angle that the curve y = 1-3x² cut the x-axis. A. 77° B. 79° C. 75° D. 120°
  9. M

    Help Pa help po sa differential calculus

    A rectangular box with square base and open at the top is to have a capacity of 16823 cu.cm. Find the height of the box that requires minimum amount of material required. a. 16.14 cm b. 14.12 cm c. 12.14 cm d. 10.36 cm
  10. M

    Help Pa help po sa differential calculus

    A rectangular box with square base and open at the top is to have a capacity of 16823 cu.cm. Find the height of the box that requires minimum amount of material required.
  11. M

    Help Pa help po sa differential calculus

    Convert the Cartesian coordinate (9, -9,2) into cylindrical coordinates. A. (9 sq. ft. of 2, 7n/4, 2) B. (9 sq. rt. Of 2, 5n/4, 2) C. (-9 sq. rt. Of 2, 3n/4, 2) D. (-9 sq. ft. of 2, 7n/4, 2)
  12. M

    Help Pa help po

    Republic Act No. 9136, also known as the Electric Power Industry Reform Act (EPIRA), is a comprehensive law that aims to provide a stable, transparent and competitive electric power industry in the Philippines. The law sets forth a number of key provisions and limitations that regulate the...
Back
Top