The process sequence according to FCFS is A-B-C-D-E-F
2.
JobProcessing time (days)Due date (days)StartFinishFlow timeTardiness
A6220660
B1214618184
C14301832322
D21832343416
E102534444419
F43444484814
Totals4818255
Average30.339.17
B D F G H Processing time (days) Due date (days) Fnish Flow time Tardiness 0 =E3+C3 =E4+C4 =E5+C5 =E6+C6 =E7+C7 =E8+C8 =F5 =F

(a) Makespan = 48 days
(b) Average flow time = 30.33 days
(c) Average tardiness = 9.17 days
(d) Average number of jobs in the system = Total flow time / Total processing time = 182 / 48 = 3.79
 
1. You do not have permission to view the full content of this post. Log in or register now.
2. You do not have permission to view the full content of this post. Log in or register now.
3. You do not have permission to view the full content of this post. Log in or register now.
4. You do not have permission to view the full content of this post. Log in or register now.
5. You do not have permission to view the full content of this post. Log in or register now.
6. You do not have permission to view the full content of this post. Log in or register now.
7. You do not have permission to view the full content of this post. Log in or register now.

ito po paps pa unlock :)
 
Status
Not open for further replies.
Back
Top