List down the control activities that may be useful to any of the following:

a) The construction of a bridge

b) The manufacture of microchips

c) The installation of powerplant

d) The manufacture of tricycles

Step 1
a)

Control activities are the procedure and techniques that ensure to reduce risks identified during the risk assessment process. These activities are taken to minimize risks. When the assessment identifies a significant risk to the achievement of an objective, a control activity is determined and implemented.

Step 2
Control activities of the construction of a bridge-

The technology should be carefully chosen for the construction of a bridge to ensure the quality of the entire bridge.
The project construction staff needs to have a thorough understanding of the entire construction to meet the construction specific needs.
There should be proper management of materials and construction units should strictly prevent unqualified materials.
There should be proper supervision of construction to avoid îllégâl operations.
 
Step 1
Controlling is a part of management activities. Which helps in monitoring the organisation operations.a proper controlling can reduce the amount of risk in the business which helps in raising the overall performance.

Step 2
A) controlling activities in constructing a bridge are:

Preparing a construction plan
Implementing a strict construction schedule.
Sophisticated management techniques like decision tree, game theory, critical path analysis, and other construction related techniques could be used for controlling during the construction of bridge. .
Controlling the cost and expenses during the construction of bridge.
Managing the resources like bricks, cement, etc.
B) controlling activities in manufacturing of micro chips.

Material inspection which identify the damaged microchip.
Plan and organise the production of microchip.
Taking the authorisation and approval of the process.
Quality control and quality assurance.
C) controlling activities for installing a power plants

Safety while doing the work in power plants.
Measuring the productivity and capacity of a power plant.
Evaluating and monitoring the site services.
Scheduling the activities. And assigning the work.
Maintaining the cost and expenses for installation of power plant.
D) controlling activities for manufacturing tricycle.

Test the tricycle before giving it to the customer. Check if there is any damages.
Focus on driving comforts, weight, seating comfort etc. Which helps in maintaining the quality tricycle.
Control the raw materials and avoid the production and assembly problem.
 